CD/10 Oil Firing Installation Completion Report
The CD/10 is OFTEC's official Oil Firing Installation Completion Report, issued when a new oil-fired appliance is installed. It confirms the installation complies with Building Regulations, covering appliance commissioning, oil storage, supply pipework, flue system, and fire protection. OFTEC-registered technicians use it to self-certify installations under the Competent Person Scheme.
Sample CD/10 certificate

Sample CD/10 with fictional data. All personal details shown are fake.
What it covers
- Oil appliance specification and commissioning readings
- Oil storage tank compliance (type, capacity, containment)
- Oil supply pipework, filter, and fire valve
- Flue system type, material, and termination
- Fire protection and separation distances
- Building Regulations notification
Who needs a CD/10?
Create your CD/10 with CertBox
Fill in the form
Pick CD/10 from the list, fill in the fields on your phone.
Compliance checks run
Built-in validation catches missing fields and out-of-range readings.
PDF generated instantly
Professional PDF ready to share via secure link or download.
Frequently asked questions about CD/10
What is the difference between a CD/10 and an OFTEC Installation Certificate?
Do I need Building Control approval for a new oil boiler?
Related certificates
OFTEC Certificate
Create OFTEC oil heating installation certificates on your phone. Appliance commissioning, tank compliance, flue checks. PDF ready in minutes, no paperwork.
Gas EngineersCD/11
Create OFTEC CD/11 oil servicing reports on your phone. Burner service, combustion analysis, tank inspection, smoke number checks. PDF in minutes.
Gas EngineersOil Service Record
Create oil boiler service records on your phone. Combustion analysis, nozzle replacement, tank inspection. PDF ready in minutes, no paperwork.