Mechanical Contractors Create in CertBox

Boiler Installation & Startup Report

This report documents the installation and initial startup of a heating or power boiler — nameplate and ASME stamp details, safety and control devices including the relief valve and low-water cutoff, and the startup combustion testing. It is the installer’s record; many states also require an installation report to be filed with the state boiler program.

ASME CSD-1, National Board Inspection Code (NBIC) Part 1, state boiler and pressure vessel lawsValid: One-off (no expiry)

No credit card required. Set up in 30 seconds.

Sample Boiler Installation certificate

Sample Boiler Installation & Startup Report certificate created with CertBox, showing the professional PDF layout with boiler nameplate, asme stamp and national board number, mawp and relief valve set pressure, low-water cutoff and limit controls

Sample Boiler Installation with fictional data. All personal details shown are fake.

What it covers

  • Boiler nameplate, ASME stamp and National Board number
  • MAWP and relief valve set pressure
  • Low-water cutoff and limit controls
  • Clearances, combustion air and venting
  • Startup firing and combustion test results
  • Jurisdiction filing status

Who needs a Boiler Installation?

Licensed mechanical contractors
Boiler installers
Building owners and facility managers
Mechanical engineers

Create your Boiler Installation with CertBox

1

Fill in the form

Pick Boiler Installation from the list, fill in the fields on your phone.

2

Compliance checks run

Built-in validation catches missing fields and out-of-range readings.

3

PDF generated instantly

Professional PDF ready to share via secure link or download.

Frequently asked questions about Boiler Installation

Does a new boiler installation have to be reported to the state?
In many states, yes — the installer files a boiler installation report (such as National Board Form I-1) with the state boiler program, which then schedules the certificate inspection. Requirements vary by state, so this report records whether and where the filing was made.
What is ASME CSD-1?
ASME CSD-1 (Controls and Safety Devices for Automatically Fired Boilers) sets the control and safety-device requirements that most jurisdictions apply to automatically fired boilers, including combustion safety testing at initial startup. This report records the devices installed and the startup tests performed.
Is this the state boiler certificate?
No. The state Certificate of Inspection or Operation, where required, is issued by the jurisdiction after an inspection by a commissioned inspector. This document is the installing contractor’s installation and startup record.

Ready to create your Boiler Installation?

Free plan available. Set up in 30 seconds, no card required.

No credit cardCancel anytimeSet up in 30 seconds

Create your Boiler Installation in minutes