A Party Wall Notice is the letter a building owner serves on the neighbouring owner before work covered by the Party Wall etc. Act 1996 starts. It is the first step under the Act, and the only one if the neighbour consents. It names the building owner, describes the work and gives the start date. A Party Wall Award comes later, and only if there is a dispute. The Act applies in England and Wales.
Party Wall etc. Act 1996Valid: Section 3 and section 6 notices lapse if work has not begun within 12 months of service
What it covers
- Type of notice (Section 1 line of junction, Section 3 party structure, or Section 6 adjacent excavation)
- Description of proposed works
- Start date and duration
- Serving and response requirements
Who needs a Party Wall Notice?
Homeowners planning work near a boundary
Developers
Basement conversion projects
Create your Party Wall Notice with CertBox
1
Fill in the form
Pick Party Wall Notice from the list, fill in the fields on your phone.
2
Send the PDF
Download it, email it to your customer or share a link. Your first one is free to send.
Frequently asked questions about Party Wall Notice
When do I need to serve a Party Wall Notice?
When building on or at the boundary line (section 1), carrying out work to a party wall or party structure listed in section 2 (a party structure notice under section 3), or excavating near a neighbouring building (section 6). Common triggers include loft conversions, extensions, and basement excavations.
How much notice do I have to give?
At least two months for a party structure notice under section 3. At least one month for a line of junction notice under section 1 and for an excavation notice under section 6.
What must the notice say?
A party structure notice must give the building owner’s name and address, the nature and details of the work, and the date it will start. If special foundations are planned, it must include plans, sections and details of the loads they will carry. An excavation notice must say whether the building owner plans to underpin or otherwise safeguard the neighbour’s foundations, with plans and sections showing the site and depth of the dig.
What if my neighbour does not reply?
For a section 3 or section 6 notice, a neighbour who has not consented in writing within 14 days is treated as dissenting, and a dispute is treated as having arisen. For a section 1 notice to build a party wall on the line, without consent within 14 days the wall can only be built wholly on the building owner’s land and at their own expense.
What happens after a dispute arises?
Under section 10, the owners either agree on one surveyor or appoint one each, and those two pick a third. If one owner does not appoint a surveyor within 10 days of being asked, the other can appoint one on their behalf. The surveyors then settle the dispute in a Party Wall Award. Either owner can appeal the award to the county court within 14 days of it being served.
Does a Party Wall Notice replace planning permission or building regulations?
No. The gov.uk guidance says the Act is separate from planning permission and building regulations approval. Work may need all three.