Solar PV G98 SSEG Commissioning Confirmation

Your first certificate is free. Then £4.99 each, or £14.99 a month for as many as you like.

Sample PV SSEG Confirmation certificate

Sample Solar PV G98 SSEG Commissioning Confirmation certificate created with CertBox, showing the professional PDF layout with sseg type and grid connection details, inverter protection relay settings (under/over voltage, under/over frequency), loss of mains protection verification

Sample PV SSEG Confirmation with fictional data. All personal details shown are fake.

A Solar PV G98 SSEG Commissioning Confirmation certifies that a small-scale embedded generator (SSEG) has been installed, commissioned, and tested in accordance with ENA Engineering Recommendation G98 (or G99 for larger installations). It confirms the inverter protection settings are compliant and records the notification to the DNO, which G98 requires no later than 28 days after commissioning.

ENA Engineering Recommendation G98 / G99, Electricity at Work Regulations 1989, BS 7671, MCS MIS 3002Valid: One-off (issued at commissioning)

What it covers

  • SSEG type and grid connection details
  • Inverter protection relay settings (under/over voltage, under/over frequency)
  • Loss of mains protection verification
  • Export limitation under EREC G100, where export is limited
  • Battery storage: location, PAS 63100 and MIS 3012 certificate number
  • Commissioning test results, including the insulation resistance test voltage
  • DNO notification status
  • Installer and site details

Who needs a PV SSEG Confirmation?

MCS certified solar PV installers
DNOs requiring commissioning confirmation
Homeowners commissioning PV systems under 16A per phase
Property developers with rooftop solar

Create your PV SSEG Confirmation with CertBox

1

Fill in the form

Pick PV SSEG Confirmation from the list, fill in the fields on your phone.

2

Send the PDF

Download it, email it to your customer or share a link. Your first one is free to send.

Frequently asked questions about PV SSEG Confirmation

What is G98 and when does it apply?
ENA Engineering Recommendation G98 applies to small-scale embedded generators (SSEGs) where all the generators at the premises add up to no more than 16A per phase, typically domestic solar PV systems. Battery storage counts towards that total. It requires the installer to use a type-tested inverter with the protection settings in the standard and to notify the DNO no later than 28 days after commissioning; installations in several premises nearby need DNO approval first. G98 replaced the withdrawn G83/2 for generation commissioned on or after 27 April 2019; larger installations fall under G99.
Do I need a G98 confirmation for every solar PV installation?
For systems up to 16A per phase you must notify the DNO using the G98 process (a G98 notification form). The commissioning confirmation documents that the inverter is set correctly and the system is safe to connect to the distribution network. Installations above the G98 threshold require a G99 application instead.

Ready to create your PV SSEG Confirmation?

Your first certificate is free. Then £4.99 each, or £14.99 a month for as many as you like.

No card to sign upSet up in 30 seconds

First certificate free