Renewable Energy Installers Create in CertBox

Solar PV System Verification Certificate

Your first certificate is free. Then £4.99 each, or £14.99 a month for as many as you like.

Sample PV Verification Cert certificate

Sample Solar PV System Verification Certificate certificate created with CertBox, showing the professional PDF layout with string voc and isc measurements, insulation resistance, positive and negative to earth, with the test voltage, earth continuity test results

Sample PV Verification Cert with fictional data. All personal details shown are fake.

A Solar PV System Verification Certificate confirms that an existing solar PV installation has been inspected and all strings, electrical connections, and protection systems verified against BS 7671 and the IET Code of Practice for Grid Connected Solar PV Systems. It is used for periodic verification, handover inspections, and pre-purchase surveys.

BS 7671, IET Code of Practice for Grid-connected Solar Photovoltaic Systems, MCS MIS 3002Valid: One-off (periodic verification recommended every 5 years)

What it covers

  • String Voc and Isc measurements
  • Insulation resistance, positive and negative to earth, with the test voltage
  • Earth continuity test results
  • DC and AC isolator operation
  • Inverter commissioning status
  • Visual inspection of modules and mounting
  • Overall system verification result and next inspection interval

Who needs a PV Verification Cert?

Property purchasers requiring pre-purchase PV survey
MCS certified solar PV installers
Building owners and landlords
Insurance assessors requiring system verification

Create your PV Verification Cert with CertBox

1

Fill in the form

Pick PV Verification Cert from the list, fill in the fields on your phone.

2

Send the PDF

Download it, email it to your customer or share a link. Your first one is free to send.

Frequently asked questions about PV Verification Cert

How often should a solar PV system be verified?
The IET Code of Practice recommends a full electrical verification every 5 years, and a visual inspection annually. Pre-purchase surveys are also recommended before buying a property with an existing solar PV installation.
What tests are included in a PV system verification?
A full verification includes string Voc and Isc measurements, insulation resistance testing, earth continuity testing, polarity checks, and functional testing of all isolators and the inverter. Results are compared against the original commissioning data.

Ready to create your PV Verification Cert?

Your first certificate is free. Then £4.99 each, or £14.99 a month for as many as you like.

No card to sign upSet up in 30 seconds

First certificate free