A Minor Works Record for multiple items keeps several small jobs on existing circuits in one schedule, such as replacing accessories or adding sockets across rooms on one visit, with test results for each item. It is your own record, not the BS 7671 Minor Works Certificate. For several items of work the IET says to issue one Electrical Installation Certificate, or a Minor Works Certificate for each circuit.
What it covers
- Works schedule with descriptions
- Location and circuit reference per item
- Type of work (addition, alteration or replacement)
- Test results per work item
- Overall assessment
- Confirmation that no new circuit was installed
Who needs a Minor Works Record (Multiple)?
Create your Minor Works Record (Multiple) with CertBox
Fill in the form
Pick Minor Works Record (Multiple) from the list, fill in the fields on your phone.
Send the PDF
Download it, email it to your customer or share a link. Your first one is free to send.
Frequently asked questions about Minor Works Record (Multiple)
When should I use a multiple items record?
Does each work item need separate test results?
Learn more
Related certificates
Minor Works
Create Minor Electrical Installation Works Certificates on your phone. BS 7671 compliant with built-in Zs validation. Your first one is free to send.
ElectriciansMinor Works Record (2-3 Circuits)
Record minor works on 2 or 3 existing circuits on your phone. Per-circuit test results to BS 7671. Your first one is free to send.