Solar & Renewables · Ireland

Solar & Renewable Symbols — Ireland (I.S. EN 62446 / I.S. 10101)

Irish solar drawings sit under I.S. 10101, the National Rules for Electrical Installations, with I.S. EN 62446-1 governing the testing, documentation and commissioning of the grid-connected system. The paperwork is what marks an Irish installation out: before a microgeneration system is energised, ESB Networks needs an NC6 notification, and the electrical work is certified by a Registered Electrical Contractor through Safe Electric.

Certs, quotes, invoices. Nothing to pay. Fill them in on site.

Get started
I.S. EN 62446-1:2016 / I.S. 10101:2020 / ESB Networks NC68 symbols
Share on WhatsApp

Generation

PV Panel / Module

Photovoltaic solar panel

BS 7671 Section 712

PV String

Series-connected group of PV modules

BS 7671 Section 712

Power Conversion

Inverter

Converts DC to AC. For microgeneration it must be compliant with the connection conditions ESB Networks accepts on an NC6 notification

BS 7671 / BS EN 62109

Storage

Battery Storage

Battery energy storage system (BESS)

BS 7671 / BS EN 62619

Protection

DC Isolator

Isolates the array from the inverter. Its presence and position are part of what the I.S. EN 62446-1 inspection records

BS 7671 / BS EN 60947-3

Metering

Generation / Export Meter

Meters generation and export. Export payment in Ireland runs through the smart meter and the supplier rather than a separate generation meter

MCS / BS 7671

EV

EV Charge Point

Electric vehicle charging station

BS 7671 Section 722

Heating

Heat Pump (ASHP)

Air source heat pump outdoor unit

MCS / BS EN 14511

Download this chart

Get a free branded PNG image of all 8 symbols. Print it, pin it to your workshop wall, or save it to your phone.

Share on WhatsApp

Frequently asked questions about solar & renewables symbols

What is an NC6 and when is it needed?
The NC6 is the notification form submitted to ESB Networks for a microgeneration connection. It is sent before the system is connected to the grid, and for domestic installations the registered installer normally submits it. Larger installations use the NC7 route instead.
Which certificate does the electrical work need?
The electrical installation is certified by a Registered Electrical Contractor through Safe Electric, the same route as any other Irish electrical work. That certificate sits alongside the I.S. EN 62446-1 inspection, testing and commissioning report for the PV system itself.
Are Irish solar symbols different from UK ones?
No. Arrays, strings, inverters, isolators, batteries and EV chargers are drawn the same way, because both countries take the symbols from the same international electrical set. The difference is entirely in the standards named and the connection paperwork behind the drawing.
Does the SEAI grant change what has to be drawn?
It changes who may do the work rather than what the drawing shows. Domestic grant-supported installations must be carried out by an installer registered with SEAI and working to its code of practice for domestic solar PV, and the documentation that code expects is the same commissioning evidence I.S. EN 62446-1 describes.

Create solar & renewables certificates on your phone

272 certificate types, filled in on your phone and signed on site. Quotes and invoices too.

Symbols based on I.S. EN 62446-1:2016 / I.S. 10101:2020 / ESB Networks NC6. This is a reference guide only — always consult the full standard for official symbol definitions.