🇬🇧
Solar & Renewables · UK

Solar PV & Renewable Energy Symbols - UK

These symbols appear on solar PV system drawings, MCS certificates, and electrical installation diagrams for renewable energy systems in the UK. They follow BS 7671 Section 712 (Solar photovoltaic systems) and Section 722 (Electric vehicle charging). Solar installers, MCS-certified engineers, and electricians use these on design and commissioning documentation.

This chart has 8 solar & renewables symbols used in the UK, in 7 groups: Generation, Power Conversion, Storage, Protection, Metering, EV, Heating. Each entry gives the drawing, what it means and the standard it comes from (BS 7671 Sections 712/722 / MCS Standards / BS EN 62109).

Last updated

Certs, quotes, invoices. Fill them in on site.

Get started
BS 7671 Sections 712/722 / MCS Standards / BS EN 621098 symbols
Share on WhatsApp

Generation

PV Panel / Module

Photovoltaic solar panel

BS 7671 Section 712

PV String

Series-connected group of PV modules

BS 7671 Section 712

Power Conversion

DCAC

Inverter (DC to AC)

DC to AC power inverter for PV system

BS 7671 / BS EN 62109

Storage

+-

Battery Storage

Battery energy storage system (BESS)

BS 7671 / BS EN 62619

Protection

DC

DC Isolator

DC disconnect switch for PV array

BS 7671 / BS EN 60947-3

Metering

kWhGEN

Generation Meter

Export / generation meter for FIT or SEG

MCS / BS 7671

EV

EV Charge Point

Electric vehicle charging station

BS 7671 Section 722

Heating

Heat Pump (ASHP)

Air source heat pump outdoor unit

MCS / BS EN 14511

All 8 at a glance

Solar PV & Renewable Energy Symbols - UK: each symbol, what it means and the standard it comes from
SymbolWhat it meansGroupStandard
PV Panel / ModulePhotovoltaic solar panelGenerationBS 7671 Section 712
PV StringSeries-connected group of PV modulesGenerationBS 7671 Section 712
Inverter (DC to AC)DC to AC power inverter for PV systemPower ConversionBS 7671 / BS EN 62109
Battery StorageBattery energy storage system (BESS)StorageBS 7671 / BS EN 62619
DC IsolatorDC disconnect switch for PV arrayProtectionBS 7671 / BS EN 60947-3
Generation MeterExport / generation meter for FIT or SEGMeteringMCS / BS 7671
EV Charge PointElectric vehicle charging stationEVBS 7671 Section 722
Heat Pump (ASHP)Air source heat pump outdoor unitHeatingMCS / BS EN 14511

Download this chart

Get a free branded PNG image of all 8 symbols. Print it, pin it to your workshop wall, or save it to your phone.

Share on WhatsApp

Frequently asked questions about solar & renewables symbols

What symbols are needed on a solar PV installation drawing?
At minimum: PV array layout, string configuration, DC isolator positions, inverter location, AC isolator, generation meter, and connection to the consumer unit. The drawing should also show the earthing arrangement.
What is MCS certification?
MCS (Microgeneration Certification Scheme) is the quality assurance scheme for small-scale renewable energy installations in the UK. MCS certification is what makes an installation eligible for Smart Export Guarantee payments, and for grants such as the Boiler Upgrade Scheme. The older Feed-in Tariff closed to new applicants on 31 March 2019; existing FiT agreements continue to run.
Do EV charger installations need specific symbols?
Yes. BS 7671 Section 722 covers EV charging installations. The installation drawing should show the charge point location, dedicated circuit, earthing arrangement, and any load management equipment.

Create solar & renewables certificates on your phone

153 certificate types, filled in on your phone and signed on site. Quotes and invoices too.

Get started free
Symbols based on BS 7671 Sections 712/722 / MCS Standards / BS EN 62109. This is a reference guide only. Always consult the full standard for official symbol definitions.